SCHNEIDER ELECTRIC

Písek

Projekt SCHNEIDER ELECTRIC Písek

Concept and realisation of a factory producing electrical parts built on a plot over 3 ha. The project was realized in three phases. LOXIA provided, in the first two phases, the complete services from the architectural and urban study, the architect‘s supervision as to the final building approval. The third phase was concluded by building permit obtaining.

Area

7380 m2 m2

Realisation

1997 – 1998, 2001, 2003

Investor

SCHNEIDER ELECTRIC a.s.