Písek, South Bohemian Region 

The completion of this plant for the production of electrical components was carried out on land in an industrial zone with an area of more than three hectares in Pisek, South Bohemia. The project was implemented in three stages: 1997 to 1998, 2001, and 2003. In the first two stages, LOXIA provided comprehensive services from the architectural and urban study through to the author's supervision and occupation permit. The third stage ended with obtaining the building permit.

GROSS FLOOR AREA

cca 13 500 m2

REALIZATION

1997 – 1998,
2001,
2003